Tenant improvement allowance (TI allowance): how it works and the math
What a tenant improvement allowance is, how TI is quoted per square foot, turnkey vs. allowance, amortizing overages, draws, lien waivers, and unused TI.

A tenant improvement allowance (TI allowance, or TIA) is a sum the landlord agrees to contribute toward building out a commercial tenant's space, usually quoted in dollars per square foot. It pays for work like walls, flooring, lighting, and HVAC changes, and the landlord gets it back over the lease term through the rent. In other words, it isn't a gift; it's closer to a construction loan that gets repaid one rent check at a time. This guide covers what the allowance pays for, how it's quoted, the main ways to structure a build-out, how to amortize costs above the allowance (with the payment math), how the money actually moves, what happens to leftover allowance, and how it all ties back to rent and term.
01 / 09
What a TI allowance covers
Tenant improvements are the changes that make a space work for a particular tenant: demising walls, offices, restrooms, flooring, ceilings, lighting, electrical and plumbing, HVAC distribution, and finishes. The allowance is the landlord's contribution to that cost, capped at a stated amount. Anything above the cap is the tenant's problem, or the subject of a negotiation.
Hard costs, the construction itself, are almost always eligible. Soft costs, like architectural and engineering fees, permits, and project management, often are too, sometimes capped at a percentage of the allowance. Furniture, equipment, cabling, signage, and moving costs are often excluded unless the lease says otherwise, because they belong to the tenant and leave with it.
Key points
- Usually eligible: construction, permanent fixtures, and building systems serving the suite
- Often eligible with a cap: design, engineering, permits, and project management
- Often excluded: furniture, equipment, trade fixtures, cabling, and moving costs
- Watch for: a landlord supervision fee charged against the allowance
02 / 09
How TI allowances are quoted
Allowances are quoted in dollars per square foot, like rent, so “$30 TI” on a 3,000 square foot space means $30 × 3,000 = $90,000. Always ask which square feet. If a space is 3,000 rentable square feet but only 2,500 usable, a $40 allowance is $120,000 on rentable area and $100,000 on usable, a $20,000 difference from one word.
The right number depends on the market, the term, the tenant's credit, and the space's condition. A raw shell needs far more work than a second-generation space with walls and restrooms already in place, and landlords price allowances accordingly. A ten-year lease supports a bigger allowance than a three-year renewal, because the landlord has longer to earn it back.
03 / 09
Turnkey, allowance, or build-to-suit
There are three main ways to structure a build-out, plus taking the space as-is. They differ in who manages construction and who carries the risk of cost overruns.
Turnkey sounds like the tenant's dream until it gets the landlord's idea of “standard finishes.” The fix is a detailed plan attached to the lease, so turnkey means the tenant's key and not just any key. Allowance deals give the tenant control of design and schedule, but put overruns on the tenant. Build-to-suit is a different animal: usually a new building designed for one tenant, with rent set to repay the whole project over a long term.
Most deals with real construction also have a work letter, a lease exhibit that spells out the plans, approvals, budget, schedule, allowance, and disbursement rules. If a lease mentions an allowance and there's no work letter, expect arguments.
| Structure | Who builds | Who pays overruns | Best for |
|---|---|---|---|
| As-is | Nobody, or the tenant at its own cost | Tenant | Second-generation space that already works |
| TI allowance | Usually the tenant's contractor, with landlord approval | Tenant, above the allowance | Tenants who want control of design and schedule |
| Turnkey | The landlord, to an agreed plan | Landlord, within the agreed scope | Tenants who want a fixed result and no construction headaches |
| Build-to-suit | The landlord or developer, often a new building | Negotiated; the cost is built into rent | Long-term single-tenant deals |
04 / 09
Paying for work above the allowance: the amortization math
Build-out bids have a way of beating the allowance. Say a tenant takes 3,000 square feet with a $30 allowance ($90,000), and the build-out bid comes in at $140,000. That leaves a $50,000 gap and three ways to close it: pay it in cash, cut the scope, or ask the landlord to fund the gap and recover it through higher rent.
When the landlord funds it, the overage is usually amortized like a loan, at an agreed interest rate over the lease term, and added to rent. The payment uses the standard loan formula: payment = principal × r ÷ (1 − (1 + r)^−n), where r is the monthly interest rate and n is the number of months.
At 8% over a 60-month term, r is 0.08 ÷ 12 and n is 60, so the tenant pays $1,013.82 a month, about $12,165.84 a year, or roughly $4.06 per square foot a year on top of base rent. Over the term that's about $60,829 in total, of which about $10,829 is interest. Spread over 120 months instead, the payment drops to $606.64, but total interest climbs to about $22,797, which is one reason the amortization period usually matches the lease term.
Two clauses ride along with any amortized overage. The tenant usually owes the unamortized balance if it defaults or the lease ends early, and the payments are typically additional rent, so missing one is a rent default.
Key points
- Allowance: $30 × 3,000 SF = $90,000
- Bid: $140,000, so the overage is $50,000
- Amortized at 8% over 60 months: $1,013.82 a month
- Annual cost: about $12,165.84, or $4.06 per SF
- Total interest over the term: about $10,829
05 / 09
How the money moves: draws, lien waivers, and retainage
An allowance is rarely a check handed over at signing. Landlords pay it in stages as work is done, and only with paperwork that proves the work was done and paid for. The reason is the mechanic's lien: contractors and suppliers who aren't paid can generally place a lien on the property they improved, and it's the landlord's property. Lien waivers are how the landlord makes sure every dollar of allowance reached the people who could file one.
A typical draw request includes the contractor's pay application, invoices, proof of payment, conditional or unconditional lien waivers from the general contractor and major subcontractors, and sometimes an architect's sign-off on the percentage complete. Many landlords also hold back retainage, a percentage of each draw, until the job is finished, the city signs off, and final lien waivers arrive.
Leases also say whose money goes first. Under a pro-rata approach on the $140,000 project above, the landlord funds $90,000 ÷ $140,000 of each draw. A $35,000 first draw gets $22,500 from the landlord; if the lease holds back 10% retainage, the landlord pays $20,250 now and $2,250 at completion. Some leases make the tenant spend its own money first; others let the allowance go first, which tenants prefer.
Key points
- Draw request: pay application, invoices, and proof of payment
- Lien waivers: conditional with the request, unconditional once paid
- Retainage: a percentage held back until completion
- Closeout: certificate of occupancy, final lien waivers, as-built drawings
- Deadline: the date by which the allowance must be requested, or it's forfeited
06 / 09
What happens to unused allowance
By default, unused allowance usually stays with the landlord. If the build-out costs $84,000 against a $90,000 allowance, the tenant typically forfeits the $6,000 unless the lease says otherwise. Tenants who expect to come in under budget negotiate this in advance.
The common fixes are to apply leftover allowance as a credit against rent, use it for soft costs or cabling, or carry it forward for later improvements. In the example, base rent is $24 per square foot on 3,000 square feet, or $6,000 a month, so a $6,000 rent credit is exactly one free month. Landlords often cap how much can convert to rent credit, because they'd rather the money end up in the building than in the tenant's bank account.
Watch the deadline too. Many leases require allowance requests within a set period after commencement; miss it and the money is gone, no matter how much was spent.
07 / 09
How the allowance ties to rent and term
The landlord underwrites an allowance like an investment. To earn 8% on $90,000 over five years, the landlord needs about $1,824.88 a month, roughly $7.30 per square foot a year, built into the rent. That's why bigger allowances come with higher rent, longer terms, or both, and why a landlord may offer more TI for a ten-year lease than for a five-year one.
Net effective rent captures the trade. A five-year lease at $24 per square foot on 3,000 square feet is $360,000 of base rent, ignoring increases. Subtract the $90,000 allowance and divide by 5 years and 3,000 square feet, and you get $18 per square foot net effective, against $24 on the face of the lease. TenantPoint's free commercial lease calculator runs the same math with free rent and yearly increases included.
The allowance also changes what's at stake in an early exit or a sale. Many leases make the unamortized allowance, and any free rent, due if the tenant defaults. And if the landlord sells or refinances mid-build-out, the new lender's SNDA may say it isn't responsible for unpaid allowance, so the tenant should make sure someone is still on the hook for the rest.
| The tenant asks for | The landlord may ask for |
|---|---|
| A bigger allowance | A longer term or higher rent |
| Allowance for soft costs and cabling | A cap on soft costs as a share of the allowance |
| Unused allowance as rent credit | A cap on the credit and a deadline |
| Landlord funding of overages | Amortization with interest, repaid on default |
| The allowance paid first and fast | Lien waivers and retainage on every draw |
08 / 09
Tax and accounting, kept general
Who owns the improvements drives the treatment, and the lease usually says. Improvements that become part of the building generally belong to the landlord at the end of the lease, and the party that pays for and owns an improvement generally depreciates it. IRS Publication 946 notes that a tenant can depreciate permanent improvements it makes to business property it rents.
Retail leases have a specific rule. Under Section 110 of the Internal Revenue Code, a tenant that uses the space to sell goods or services to the general public, under a lease of 15 years or less counting renewal options (other than an option to renew at fair market value, determined at renewal), can exclude from income an allowance (cash or a rent reduction) to the extent it spends the money on improvements to the real property (not equipment or other personal property) that revert to the landlord when the lease ends, and the landlord treats those improvements as its own property. Retail is read broadly here: the regulation's examples of services sold to the general public include hair stylists, doctors, lawyers, accountants and bankers. The Treasury regulation adds conditions: the lease must say expressly that the allowance is for those improvements (a side agreement counts if it's signed before the allowance is paid), the money generally must be spent within eight and a half months after the end of the tax year it was received, and each side must attach a statement about the allowance to its tax return for that year. Outside that rule, an allowance can be taxable to the tenant, depending on who owns what.
On the books, an allowance that pays for the landlord's own asset is generally capitalized and depreciated by the landlord, while cash given to the tenant for the tenant's own assets is generally treated as a lease incentive that reduces rental income over the term. The facts and the lease wording matter here, so bring your CPA the lease and the work letter before you sign, not after the first tax season.
09 / 09
A checklist for the work letter
A good work letter answers the questions that otherwise turn into change orders and emails. Use this as a checklist; it's general information, not legal or tax advice, and a real estate attorney should draft or review the actual language.
Key points
- The allowance in dollars per square foot, and which square feet
- Eligible costs, including any cap on soft costs and whether cabling or signage qualify
- Plans, approvals, and who picks the contractor
- Who pays first, the draw schedule, lien waiver requirements, and retainage
- The deadline to use the allowance, and what happens to any unused amount
- How overages are funded: cash, or amortized at a stated rate over a stated term
- Repayment of unamortized amounts on default or early termination
- Who owns the improvements at the end, and whether the tenant must remove anything
- For a retail tenant counting on Section 110, an express statement, in the lease or in a side agreement signed before the allowance is paid, that the allowance is for building or improving real property at the premises that reverts to the landlord
FAQ
Frequently asked questions
What is a tenant improvement allowance?
A tenant improvement allowance is money a landlord agrees to contribute toward building out a commercial tenant's space, usually quoted in dollars per square foot. It covers work like walls, flooring, lighting, and HVAC changes, and the landlord recovers it over the lease term through the rent.
What does TIA mean in real estate?
TIA stands for tenant improvement allowance: the landlord's contribution toward building out a tenant's space, usually quoted per square foot. You'll also see it written as TI allowance or just TI.
What does a TI allowance cover?
Construction costs for the space, such as walls, ceilings, flooring, lighting, plumbing, electrical, and HVAC work, and often soft costs like design, engineering, and permits, sometimes with a cap. Furniture, equipment, cabling, and moving costs are often excluded unless the lease includes them.
What is a typical TI allowance per square foot?
There's no standard number. It depends on the market, the property type, the condition of the space, the length of the lease, and the tenant's credit. A raw shell space on a long lease earns a much bigger allowance than a second-generation space on a short renewal.
How is a TI allowance paid out?
Usually in draws as work progresses. The tenant or its contractor submits a draw request with invoices and lien waivers, the landlord pays its share, and a retainage may be held until the work is complete and final lien waivers are delivered. Some leases reimburse the tenant in one payment after completion instead.
What happens if the build-out costs more than the TI allowance?
The tenant pays the difference in cash, cuts the scope, or asks the landlord to fund it and amortize it into rent. A $50,000 overage amortized at 8% over 60 months adds $1,013.82 a month to the rent.
What happens to unused TI allowance?
Unless the lease says otherwise, the landlord usually keeps it. Tenants often negotiate the right to apply leftover allowance to rent, soft costs, or cabling, usually with a cap and a deadline.
Is a TI allowance taxable to the tenant?
It depends. Under Section 110 of the Internal Revenue Code, a tenant that sells goods or services to the general public, on a lease of 15 years or less (counting renewal options other than one at fair market value), can exclude an allowance to the extent it spends the money on real-property improvements that revert to the landlord, if the lease says expressly what the allowance is for, the money is spent in time, and each side attaches a statement to its tax return. In other situations the answer turns on who owns the improvements, so ask a CPA.
Who owns tenant improvements when the lease ends?
Usually the landlord, because improvements attached to the building generally stay with it. Leases often let the landlord require the tenant to remove certain improvements and restore the space, so check the surrender and alterations clauses.
What is the difference between a TI allowance and turnkey?
With a TI allowance, the landlord contributes a fixed amount and the tenant typically manages construction and pays any overrun. With turnkey, the landlord builds the space to an agreed plan and carries the cost, so the tenant moves in ready to go but has less control over the result.
Free checklists
Get the lease abstraction and renewal checklists
The fields to pull from every lease, the renewal steps to calendar, and a rent roll template to keep the results in one place.
- Commercial Lease Abstraction ChecklistPrintable checklist
- Commercial Lease Renewal Checklist for LandlordsPrintable checklist
- Commercial rent roll templateSpreadsheet template
Put it into practice
TenantPoint doesn't track TI allowances or amortization; it keeps each lease, rent schedule, and key dates in Commercial lease management software and Commercial property record management. See all TenantPoint solutions or how it compares with other software.
Sources
Where the numbers come from
- Cornell Law School LII: 26 U.S. Code § 110, qualified lessee construction allowances for short-term leases
- Cornell Law School LII: 26 CFR § 1.110-1, qualified lessee construction allowances
- Cornell Law School LII: 26 U.S. Code § 168(i)(3), how a lease term counts renewal options
- IRS Publication 946: How to Depreciate Property
- Cornell Law School LII: mechanic's lien
This educational material is not legal, accounting, tax, or investment advice. Review controlling lease language and consult qualified professionals when appropriate.
Back to resources